You are viewing the site in preview mode

Skip to main content

Advertisement

Table 7 Mean values (standard deviation) for group 1 and 2 in Case 1 for readiness for implementation (level 4) at baseline and post-intervention

From: Building implementation capacity (BIC): a longitudinal mixed methods evaluation of a team intervention

  Case 1
Intervention group 1 Intervention group 2
N Mean (SD) N Mean (SD)
Baseline 202 3.79 (.83) 117 3.77 (.64)
Post-intervention 135 4.27 (.62) 95 3.79 (.76)
  1. Scale 1–10
  2. Significant difference from baseline to post-intervention for Intervention group 1:
  3. Mdiff = .44, SE = 0.07, t = 6.18, p < .001)